I-84 TR 803 over I-84 WB RT 7 NB BEAVER B

US RT 7 SB TO I-84 EB · County 001, Connecticut · Built 1960 · 1 Lanes · 8,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
00548
Year Built
1960
Reconstructed
2015
Length
269.7 m (884.8 ft)
Max Span
24.1 m
Width
9.7 m (31.8 ft)
Lanes
1
Daily Traffic
8,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.