US ROUTE 7 NB over SR 805 (FEDERAL ROAD)

NB US ROUTE 7 OVER SR 805 · County 001, Connecticut · Built 1962 · 3 Lanes · 27,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00550
Year Built
1962
Length
45.1 m (148 ft)
Max Span
24.1 m
Width
17.3 m (56.8 ft)
Lanes
3
Daily Traffic
27,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.