US ROUTE 7 SB over SR 805 (FEDERAL ROAD)

0.5 MI SOUTH EXIT 11 · County 001, Connecticut · Built 1962 · 2 Lanes · 20,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00551
Year Built
1962
Reconstructed
1987
Length
49.1 m (161.1 ft)
Max Span
23.6 m
Width
17.3 m (56.8 ft)
Lanes
2
Daily Traffic
20,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.