SR 911 (NEWTOWN RO over INTERSTATE 84

EXIT 8 ROUTE 84 & US 6 · County 001, Connecticut · Built 1962 · 3 Lanes · 12,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
01199
Year Built
1962
Reconstructed
1996
Length
80.5 m (264.1 ft)
Max Span
25.3 m
Width
15.6 m (51.2 ft)
Lanes
3
Daily Traffic
12,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.