ROUTE 2 over SR 517 SB

AT EXIT 5 A · County 003, Connecticut · Built 1962 · 4 Lanes · 63,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00379
Year Built
1962
Reconstructed
1993
Length
23.8 m (78.1 ft)
Max Span
22.3 m
Width
28.2 m (92.5 ft)
Lanes
4
Daily Traffic
63,800
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.