ROUTE 2 over SUTTON AVENUE

AT EXIT 5B · County 003, Connecticut · Built 1951 · 4 Lanes · 68,600 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
00381
Year Built
1951
Reconstructed
2024
Length
17.4 m (57.1 ft)
Max Span
15.9 m
Width
27.1 m (88.9 ft)
Lanes
4
Daily Traffic
68,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.