RTE 15 SB & RAMP over US ROUTE 5 (MAIN STREET)
.6 MILE E OF HARTFORD TL · County 003, Connecticut · Built 1991 · 3 Lanes · 33,100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
41.758558, -72.643664
This bridge is in worse condition than 36.4% of bridges in County 003. The average bridge in Connecticut is 0 years old; this one is 35 years old.
Nearby Bridges
ROUTE 15 NB over ROUTE 5 (MAIN STREET)
Built 1991
U.S. ROUTE 5 over HOCKANUM RIVER
Built 1941
SR502 E. RIVER DR over HOCKANUM RIVER
Built 1992
INTERSTATE-84 over HOCKANUM RIVER
Built 1964
US ROUTE 5 TR 804 over ROUTE 2 WESTBOUND
Built 1991
ROUTE 2 over HOCKANUM RIVER
Built 1962
ROUTE 15 over SR 502 SILVER LANE
Built 1987
INTERSTATE-84 over US ROUTE 5 & I84 RMP 116
Built 1963
ROUTE 2 EASTBOUND over EAST RIVER DRIVE
Built 1992
ROUTE 2 WESTBOUND over EAST RIVER DRIVE
Built 1992
Bridge Details
- Structure #
- 06043B
- Year Built
- 1991
- Length
- 45.1 m (148 ft)
- Max Span
- 43.3 m
- Width
- 32.2 m (105.6 ft)
- Lanes
- 3
- Daily Traffic
- 33,100
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $19,133,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.