U.S. ROUTE 1 over NOROTON RIVER

AT THE DARIEN TOWN LINE · County 001, Connecticut · Built 1913 · 4 Lanes · 7,900 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
00315
Year Built
1913
Reconstructed
2021
Length
16 m (52.5 ft)
Max Span
13.9 m
Width
24.7 m (81 ft)
Lanes
4
Daily Traffic
7,900
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$11,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.