HOLLOW TREE RDG RD over INTERSTATE 95

BETWEEN EXIT 9 AND 10 · County 001, Connecticut · Built 1958 · 2 Lanes · 3,100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00041
Year Built
1958
Reconstructed
2009
Length
58.8 m (192.9 ft)
Max Span
28.3 m
Width
16.1 m (52.8 ft)
Lanes
2
Daily Traffic
3,100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.