INTERSTATE-95 over BROOKSIDE DRIVE

0.2 MI S OF SERVICE AREA · County 001, Connecticut · Built 1958 · 7 Lanes · 110,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00040
Year Built
1958
Reconstructed
1990
Length
24.7 m (81 ft)
Max Span
22.6 m
Width
42.3 m (138.8 ft)
Lanes
7
Daily Traffic
110,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.