I-95 & I-95 RAMPS over MNRR & LOCAL ROADS

0.2 MI EAST OF EXIT 8 NB · County 001, Connecticut · Built 1958 · 7 Lanes · 112,800 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
00032
Year Built
1958
Reconstructed
1993
Length
324.7 m (1065.3 ft)
Max Span
60.8 m
Width
31 m (101.7 ft)
Lanes
7
Daily Traffic
112,800
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$20,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.