INTERSTATE-95 over LOCKWOOD AVENUE

AT I-95 EXIT 3 SB · County 001, Connecticut · Built 1958 · 7 Lanes · 112,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00034
Year Built
1958
Reconstructed
1991
Length
24.1 m (79.1 ft)
Max Span
22.6 m
Width
36.5 m (119.8 ft)
Lanes
7
Daily Traffic
112,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.