COUNTY ROAD 3 over WILEY DRAINAGE

.9 MI N OF US 50 · County 099, Colorado · Built 1998 · 2 Lanes · 102 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
PR3-2.0-33.9-8A
Year Built
1998
Length
15.3 m (50.2 ft)
Max Span
14.1 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
102
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.