US 50 ML over AMITY CANAL

5.6 MI W of Lamar · County 099, Colorado · Built 1982 · 4 Lanes · 7,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
L-26-BR
Year Built
1982
Length
18.9 m (62 ft)
Max Span
17.4 m
Width
35 m (114.8 ft)
Lanes
4
Daily Traffic
7,800
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.