US 287 ML over US 50 ML

JCT SH 287 WILEY JCT · County 099, Colorado · Built 1988 · 2 Lanes · 4,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
L-26-BU
Year Built
1988
Length
69.1 m (226.7 ft)
Max Span
34.7 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
4,100
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.