MAINSTREET EB over CHERRY CREEK | CHERRY CR

1.0 MI WEST OF HWY 83 · County 035, Colorado · Built 2000 · 2 Lanes · 13,212 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
PAR PARKER-6.1B
Year Built
2000
Length
74.8 m (245.4 ft)
Max Span
36.3 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
13,212
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$752,000
Total Project Cost
$827,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.