MAINSTREET EB over CHERRY CREEK | CHERRY CR
1.0 MI WEST OF HWY 83 · County 035, Colorado · Built 2000 · 2 Lanes · 13,212 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.519717, -104.780153
This bridge is in worse condition than 87.5% of bridges in County 035. The average bridge in Colorado is 0 years old; this one is 26 years old.
Nearby Bridges
MAINSTREET WB over CHERRY CREEK | CHERRY CR
Built 1987
TWENTY MILE ROAD over SULPHUR GULCH | SULPHUR
Built 2000
STONEGATE PARKWAY over NEWLIN GULCH
Built 1995
SH 83 ML over SULPHUR GULCH
Built 1981
S PIKES PEAK DRIVE over SULPHUR GULCH
Built 1989
DRANSFELDT ROAD over SULPHUR GULCH | SULPHUR
Built 2000
LINCOLN AVENUE WB over CHERRY CREEK | COLORADO
Built 2000
LINCOLN AVENUE EB over CHERRY CREEK | CHERRY CR
Built 1998
JORDAN ROAD over NEWLIN GULCH | NEWLIN GU
Built 1995
LINCOLN AVENUE EB over NEWLIN GULCH | NEWLIN GU
Built 1998
Bridge Details
- Structure #
- PAR PARKER-6.1B
- Year Built
- 2000
- Length
- 74.8 m (245.4 ft)
- Max Span
- 36.3 m
- Width
- 11.7 m (38.4 ft)
- Lanes
- 2
- Daily Traffic
- 13,212
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $752,000
- Total Project Cost
- $827,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.