JORDAN ROAD over NEWLIN GULCH | NEWLIN GU

0.1 MI S OF LINCOLN AVE. · County 035, Colorado · Built 1995 · 5 Lanes · 23,638 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
PAR JORDAN-0.1
Year Built
1995
Length
32.3 m (106 ft)
Max Span
14.8 m
Width
22.1 m (72.5 ft)
Lanes
5
Daily Traffic
23,638
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.