JORDAN ROAD over NEWLIN GULCH | NEWLIN GU
0.1 MI S OF LINCOLN AVE. · County 035, Colorado · Built 1995 · 5 Lanes · 23,638 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
39.532078, -104.793536
This bridge is in worse condition than 28.4% of bridges in County 035. The average bridge in Colorado is 0 years old; this one is 31 years old.
Nearby Bridges
STONEGATE PARKWAY over NEWLIN GULCH
Built 1995
LINCOLN AVENUE EB over CHERRY CREEK | CHERRY CR
Built 1998
LINCOLN AVENUE WB over CHERRY CREEK | COLORADO
Built 2000
LINCOLN AVENUE WB over NEWLIN GULCH | NEWLIN GU
Built 2000
LINCOLN AVENUE EB over NEWLIN GULCH | NEWLIN GU
Built 1998
MAINSTREET WB over CHERRY CREEK | CHERRY CR
Built 1987
MAINSTREET EB over CHERRY CREEK | CHERRY CR
Built 2000
PINE LANE over CHERRY CREEK | CHERRY CR
Built 2008
E-470 WB over Jordan Road
Built 1989
E-470 EB over Jordan Road
Built 1989
Bridge Details
- Structure #
- PAR JORDAN-0.1
- Year Built
- 1995
- Length
- 32.3 m (106 ft)
- Max Span
- 14.8 m
- Width
- 22.1 m (72.5 ft)
- Lanes
- 5
- Daily Traffic
- 23,638
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.