MAINSTREET WB over CHERRY CREEK | CHERRY CR

1.0 MI W OF HWY 83 · County 035, Colorado · Built 1987 · 2 Lanes · 12,244 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
PAR PARKER-6.1A
Year Built
1987
Length
74.8 m (245.4 ft)
Max Span
36.3 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
12,244
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.