US 160 ML over MARTINEZ CREEK
8 MI W OF PAGOSA SPRINGS · County 007, Colorado · Built 1972 · 2 Lanes · 8,700 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
37.238053, -107.133303
This bridge is in worse condition than 33.3% of bridges in County 007. The average bridge in Colorado is 0 years old; this one is 54 years old.
Nearby Bridges
N. PAGOSA BLVD. over RESERVOIR SPILLWAY
Built 1975
IRR# CO RD 700A over STOLLSTEIMER CREEK
Built 2012
US160 ML over MCCABE CREEK
Built 2019
APACHE STREET over SAN JUAN RIVER
Built 1998
HOT SPRINGS BLVD. over SAN JUAN RIVER
Built 1989
US 160 ML over SAN JUAN RIVER
Built 1962
US 160 ML over WILDLIFE CROSSING
Built 2022
US 160 ML over DEVIL CREEK
Built 1955
IRR# CO RD 700 over CAT CREEK
Built 1997
Bridge Details
- Structure #
- P-08-AG
- Year Built
- 1972
- Length
- 16.5 m (54.1 ft)
- Max Span
- 3 m
- Width
- 25.4 m (83.3 ft)
- Lanes
- 2
- Daily Traffic
- 8,700
- Material
- Steel
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.