US 160 ML over SAN JUAN RIVER
IN PAGOSA SPRINGS · County 007, Colorado · Built 1962 · 2 Lanes · 8,800 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
37.269089, -107.002025
This bridge is in worse condition than 33.3% of bridges in County 007. The average bridge in Colorado is 0 years old; this one is 64 years old.
Nearby Bridges
HOT SPRINGS BLVD. over SAN JUAN RIVER
Built 1989
US160 ML over MCCABE CREEK
Built 2019
APACHE STREET over SAN JUAN RIVER
Built 1998
US 160 ML over SAN JUAN RIVER
Built 1996
N. PAGOSA BLVD. over RESERVOIR SPILLWAY
Built 1975
HAREBELL DR over SAN JUAN RIVER
Built 2012
US 160 ML over TURKEY CREEK
Built 1946
US 160 ML over MARTINEZ CREEK
Built 1972
IRR# US 84 ML over RIO BLANCO
Built 1962
COUNTY ROAD 337 over RIO BLANCO RIVER
Built 1940
Bridge Details
- Structure #
- O-08-A
- Year Built
- 1962
- Length
- 57.5 m (188.6 ft)
- Max Span
- 21.6 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 2
- Daily Traffic
- 8,800
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $882,000
- Total Project Cost
- $971,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.