IRR# CO RD 700 over CAT CREEK

4.7 Mi NE of Camado · County 007, Colorado · Built 1997 · 2 Lanes · 42 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
AR700-S102-160A
Year Built
1997
Length
22 m (72.2 ft)
Max Span
20.7 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
42
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.