IRR# SH 151 ML over STOLLSTEIMER CREEK
10.9 MILES NE OF ARBOLES · County 007, Colorado · Built 2023 · 2 Lanes
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
37.161153, -107.327244
This bridge is in worse condition than 15.6% of bridges in County 007. The average bridge in Colorado is 0 years old; this one is 3 years old.
Nearby Bridges
IRR# SH 151 ML over STOLLSTEIMER CREEK
Built 1968
IRR# SH 151 ML over STOLLSTEIMER CREEK
Built 1968
IRR BIA RTE 163 over DEVIL CREEK
Built 1987
US 160 ML over DEVIL CREEK
Built 1955
US 160 ML over PIEDRA RIVER
Built 1954
US 160 ML over WILDLIFE CROSSING
Built 2022
US 160 ML over YELLOW JACKET CREEK
Built 1958
NAVAJO ROAD over PIEDRA RIVER
Built 1913
IRR# CO RD 700A over STOLLSTEIMER CREEK
Built 2012
IRR# SH 151 ML over PIEDRA RIVER
Built 1961
Bridge Details
- Structure #
- P-07-SA
- Year Built
- 2023
- Length
- 8.1 m (26.6 ft)
- Max Span
- 3.8 m
- Width
- 24.7 m (81 ft)
- Lanes
- 2
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $412,000
- Total Project Cost
- $453,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.