US 160 ML over PIEDRA RIVER
22 MI W. OF PAGOSA SPRING · County 007, Colorado · Built 1954 · 2 Lanes · 4,300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
37.224369, -107.342017
This bridge is in worse condition than 33.3% of bridges in County 007. The average bridge in Colorado is 0 years old; this one is 72 years old.
Nearby Bridges
IRR BIA RTE 163 over DEVIL CREEK
Built 1987
US 160 ML over DEVIL CREEK
Built 1955
US 160 ML over YELLOW JACKET CREEK
Built 1958
US 160 ML over WILDLIFE CROSSING
Built 2022
IRR# SH 151 ML over STOLLSTEIMER CREEK
Built 1968
IRR# SH 151 ML over STOLLSTEIMER CREEK
Built 1968
IRR# SH 151 ML over STOLLSTEIMER CREEK
Built 2023
IRR# CO RD 700A over STOLLSTEIMER CREEK
Built 2012
FDR 622 over PIEDRA RIVER
Built 1957
Bridge Details
- Structure #
- P-07-A
- Year Built
- 1954
- Length
- 50.2 m (164.7 ft)
- Max Span
- 17.8 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 4,300
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.