NAVAJO ROAD over PIEDRA RIVER
0.3 MILES W OF SH 151 · County 007, Colorado · Built 1913 · 1 Lanes · 927 vehicles/day
Overall
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
37.075989, -107.40535
This bridge is in worse condition than 33.3% of bridges in County 007. The average bridge in Colorado is 0 years old; this one is 113 years old.
Nearby Bridges
IRR# SH 151 ML over PIEDRA RIVER
Built 1961
IRR# CO RD 988 over SAMBRITO CREEK
Built 1992
IRR# CO RD 500 over SANDOVAL CANYON
Built 1970
IRR BIA RTE 159 over PINE RIVER CANAL
Built 1998
IRR# SH 151 ML over STOLLSTEIMER CREEK
Built 1968
SH 151 ML over DEVIL CREEK
Built 1980
IRR# SH 151 ML over STOLLSTEIMER CREEK
Built 2023
IRR# COUNTY RD 334 over ALLISON DITCH
Built 1989
IRR# SH 151 ML over STOLLSTEIMER CREEK
Built 1968
COUNTY ROAD 321 over SPRING CREEK
Built 1995
Bridge Details
- Structure #
- ARF50-WO.1-S151
- Year Built
- 1913
- Reconstructed
- 1935
- Length
- 36.6 m (120.1 ft)
- Max Span
- 36.1 m
- Width
- 4.3 m (14.1 ft)
- Lanes
- 1
- Daily Traffic
- 927
- Material
- Steel
- Design
- Truss - Thru
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,150,000
- Total Project Cost
- $2,680,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.