SH 151 ML over DEVIL CREEK

5.3 MI NW OF ALLISON · County 067, Colorado · Built 1980 · 2 Lanes · 1,500 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
P-06-AF
Year Built
1980
Length
6.9 m (22.6 ft)
Max Span
6.9 m
Width
41 m (134.5 ft)
Lanes
2
Daily Traffic
1,500
Material
Steel
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.