I 25 FRONTAGE RD over WALSEN ARROYO SR
2.8 MI S OF SH10-WLSNBRG. · County 055, Colorado · Built 1969 · 2 Lanes · 72 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
37.5952, -104.744428
This bridge is in worse condition than 38.3% of bridges in County 055. The average bridge in Colorado is 0 years old; this one is 57 years old.
Nearby Bridges
I 25 ML NBND over WALSEN ARROYO
Built 1969
I25 ML SBND over WALSEN ARROYO
Built 2001
I 25 BUS RT over I 25 ML
Built 1963
COUNTY ROAD 330 over BEAR CREEK
Built 1991
I 25 BUS RT over BEAR CREEK
Built 1933
I 25 ML SBND over BEAR CREEK
Built 1963
I 25 ML NBND over BEAR CREEK
Built 1963
I 25 ML NBND over PRIVATE ROAD
Built 1969
I 25 ML SBND over PRIVATE ROAD
Built 1969
I 25 BUS RT over CUCHARAS RIVER
Built 1933
Bridge Details
- Structure #
- N-18-X
- Year Built
- 1969
- Length
- 41 m (134.5 ft)
- Max Span
- 15.8 m
- Width
- 8.7 m (28.5 ft)
- Lanes
- 2
- Daily Traffic
- 72
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.