I 25 ML SBND over BEAR CREEK

0.4 MI S OF SH10-WLSNBRG · County 055, Colorado · Built 1963 · 2 Lanes · 5,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
N-17-BO
Year Built
1963
Length
56.6 m (185.7 ft)
Max Span
18.3 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
5,000
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,089,000
Total Project Cost
$3,133,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.