I 25 ML NBND over WALSEN ARROYO

13.2 MILES N OF AGUILAR · County 055, Colorado · Built 1969 · 2 Lanes · 5,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
N-18-U
Year Built
1969
Length
41.1 m (134.8 ft)
Max Span
15.8 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
5,500
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.