US 50 ML WBND over THOMPSON ARROYO

2 MI E OF LA JUNTA · County 089, Colorado · Built 1931 · 2 Lanes · 1,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
M-23-A
Year Built
1931
Length
28.3 m (92.8 ft)
Max Span
7 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
1,600
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$396,000
Total Project Cost
$435,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.