LA JUNTA 14TH ST. over KING ARROYO
1000 FEET W ADAMS AVE · County 089, Colorado · Built 1991 · 2 Lanes · 568 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
37.975319, -103.531136
This bridge is in worse condition than 65.8% of bridges in County 089. The average bridge in Colorado is 0 years old; this one is 35 years old.
Nearby Bridges
SIXTH ST. over KING ARROYO
Built 1973
THIRD ST. over KING ARROYO
Built 1931
US 50 ML over KING ARROYO
Built 1961
SH 109 ML over RDWY RR ARKANSAS RVR
Built 1967
FIFTH ST. over ANDERSON ARROYO
Built 1915
THIRD STREET over ANDERSON ARROYO
Built 1931
CITY ST DIKE ROAD over FORT LYON SLUICE DITCH
Built 2000
US 50 ML over ANDERSON ARROYO
Built 1961
PRINGLE STREET over ANDERSON ARROYO
Built 1988
US 50 ML EBND over OTERO CANAL
Built 1957
Bridge Details
- Structure #
- OTZ-29-22.5-221
- Year Built
- 1991
- Length
- 12.4 m (40.7 ft)
- Max Span
- 11.9 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 568
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.