SIXTH ST. over KING ARROYO

2 BLOCKS E OF SH 109 · County 089, Colorado · Built 1973 · 2 Lanes · 1,307 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
LJ 2-SIXTH ST.
Year Built
1973
Length
25.1 m (82.3 ft)
Max Span
23.9 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
1,307
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.