Clearwater Drive over Local Drainage
N. of Valley Oak Dr. · County 069, Colorado · Built 2007 · 2 Lanes · 619 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
40.444025, -105.021803
This bridge is in worse condition than 61.7% of bridges in County 069. The average bridge in Colorado is 0 years old; this one is 19 years old.
Nearby Bridges
County Road 11C over Boyd/Horseshoe Canal
Built 2015
I 25 ML SBND over CROSSROADS BLVD.
Built 2017
I 25 ML NBND over CROSSROADS BLVD.
Built 2017
I-25 ML SBND over UPRR/FUTURE KENDALL PWY
Built 2020
I-25 ML NBND over UPRR/FUTURE KENDALL PWY
Built 2022
I25/CNTR LOAD BUS over PEDESTRIAN UNDERPASS
Built 2021
Park Drive over Westerdall Lake Outlet
Built 1993
Rocky Mountain Ave over Greeley Loveland Canal
Built 2000
Piney River Drive over Greeley Loveland Canal
Built 2000
N. Boyd Lake Ave over Greeley Loveland Canal
Built 2019
Bridge Details
- Structure #
- LOV5040CLEARWTR
- Year Built
- 2007
- Length
- 6.7 m (22 ft)
- Max Span
- 3 m
- Width
- 21.1 m (69.2 ft)
- Lanes
- 2
- Daily Traffic
- 619
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.