County Road 60.5 over Harmony No. 1 Canal
0.4 Mi E of Co Rd 79 · County 075, Colorado · Built 1965 · 2 Lanes · 28 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
40.872328, -102.8177
This bridge is in worse condition than 81.9% of bridges in County 075. The average bridge in Colorado is 0 years old; this one is 61 years old.
Nearby Bridges
County Road 81 over Harmony No. 1 canal
Built 1995
SH 55 ML over SOUTH PLATTE RIVER
Built 1987
SH 55 ML over SOUTH PLATTE RIVER
Built 1987
SH 55 ML over SOUTH PLATTE RIVER
Built 1987
County Road 58 over Harmony No. 1 canal
Built 1997
SH 55 ML over SOUTH PLATTE RIVER
Built 1987
County Road 83 over Duck Creek
Built 1993
County Road 66 over Duck Creek
Built 1993
County Road 85 over Harmony No. 1 Canal
Built 2006
US 138 ML over SPRING CANYON CREEK
Built 1979
Bridge Details
- Structure #
- LOG60.5-79.4178
- Year Built
- 1965
- Length
- 13 m (42.7 ft)
- Max Span
- 12.4 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 28
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.