County Road 85 over Harmony No. 1 Canal

1.4 Mi N of US Hwy 138 · County 075, Colorado · Built 2006 · 2 Lanes · 25 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
LOG85-62.7-225A
Year Built
2006
Length
12.2 m (40 ft)
Max Span
11.1 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
25
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.