County Road 58 over Harmony No. 1 canal
0.8 Mi E of Co Rd 75 · County 075, Colorado · Built 1997 · 2 Lanes · 75 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
40.850178, -102.849933
This bridge is in worse condition than 45.1% of bridges in County 075. The average bridge in Colorado is 0 years old; this one is 29 years old.
Nearby Bridges
US 138 ML over SPRING CANYON CREEK
Built 1979
County Road 56.3 over Harmony No2 Return Canal
Built 1930
US 138 ML over HARMONY DITCH NO 2
Built 1993
County Rd. 56 over Harmony No. 1 Canal
Built 2016
County Road 60.5 over Harmony No. 1 Canal
Built 1965
SH 55 ML over SOUTH PLATTE RIVER
Built 1987
SH 55 ML over SOUTH PLATTE RIVER
Built 1987
SH 55 ML over SOUTH PLATTE RIVER
Built 1987
SH 55 ML over SOUTH PLATTE RIVER
Built 1987
County Road 71 over Harmony No. 2 Ditch
Built 1996
Bridge Details
- Structure #
- LOG58-75.8-170A
- Year Built
- 1997
- Length
- 15.8 m (51.8 ft)
- Max Span
- 14.3 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 75
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.