County Road 71 over Harmony No. 2 Ditch
1.1 Mi N of US Hwy 138 · County 075, Colorado · Built 1996 · 2 Lanes · 168 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
40.838175, -102.903233
This bridge is in worse condition than 14.8% of bridges in County 075. The average bridge in Colorado is 0 years old; this one is 30 years old.
Nearby Bridges
County Rd. 56 over Harmony No. 1 Canal
Built 2016
US 138 ML over HARMONY DITCH NO 2
Built 1993
US 138 ML over SPRING CANYON CREEK
Built 1979
County Road 56.3 over Harmony No2 Return Canal
Built 1930
County Road 58 over Harmony No. 1 canal
Built 1997
County Road 65 over Skinner Draw
Built 1982
County Road 52 over Harmony No. 2 Canal
Built 1920
County Road 67 over South Platte River
Built 2011
County Road 67 over South Platte River
Built 1983
County Road 67 over South Platte River
Built 1996
Bridge Details
- Structure #
- LOG71-56.3-264
- Year Built
- 1996
- Length
- 10.6 m (34.8 ft)
- Max Span
- 9.2 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 168
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.