COUNTY RD 20.8 over MOORE CANYON CREEK
JUST W OF CR 67.9 · County 071, Colorado · Built 1935 · 2 Lanes · 30 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
37.158817, -104.523672
This bridge is in worse condition than 85.9% of bridges in County 071. The average bridge in Colorado is 0 years old; this one is 91 years old.
Nearby Bridges
I 25 ML over ARROYO
Built 1951
COUNTY ROAD 20.8 over I 25 ML
Built 1959
I 25 ML SBND over MAIN STREET
Built 2012
I 25 ML NBND over MAIN STREET
Built 2009
I 25 SBND OFFRAMP over PURGATOIRE RIVER
Built 2010
I 25 ML SBND over PURGATOIRE RIVER
Built 2011
I 25 ML NBND over PURGATOIRE RIVER
Built 2009
I 25 NBND ON RAMP over PURGATOIRE RIVER
Built 2009
SH 12 ML over PURGATOIRE RIVER
Built 2005
I 25 ML SBND over SH12 RR CITY ST DITCH
Built 2010
Bridge Details
- Structure #
- LA20.8-35-12-47
- Year Built
- 1935
- Length
- 8.4 m (27.6 ft)
- Max Span
- 7.1 m
- Width
- 5.1 m (16.7 ft)
- Lanes
- 2
- Daily Traffic
- 30
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $458,000
- Total Project Cost
- $573,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.