I 25 ML NBND over MAIN STREET

In TRINIDAD · County 071, Colorado · Built 2009 · 2 Lanes · 8,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
P-18-BI
Year Built
2009
Length
37.4 m (122.7 ft)
Max Span
36 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
8,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.