SH 12 ML over PURGATOIRE RIVER
Just E. of I25 inTrinidad · County 071, Colorado · Built 2005 · 2 Lanes · 9,400 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
37.16785, -104.510592
This bridge is in worse condition than 31.2% of bridges in County 071. The average bridge in Colorado is 0 years old; this one is 21 years old.
Nearby Bridges
I 25 NBND ON RAMP over PURGATOIRE RIVER
Built 2009
I 25 ML NBND over PURGATOIRE RIVER
Built 2009
I 25 ML SBND over PURGATOIRE RIVER
Built 2011
I 25 SBND OFFRAMP over PURGATOIRE RIVER
Built 2010
ANIMAS ST over PURGATOIRE RIVER
Built 1962
I 25 ML NBND over SH12 RR CTY STS. DITCH
Built 2009
I 25 ML SBND over SH12 RR CITY ST DITCH
Built 2010
I 25 ML NBND over MAIN STREET
Built 2009
I 25 ML SBND over MAIN STREET
Built 2012
COLLEGE ST / CEDAR over PURGATOIRE RIVER
Built 1993
Bridge Details
- Structure #
- P-18-AX
- Year Built
- 2005
- Length
- 91.4 m (299.9 ft)
- Max Span
- 30.4 m
- Width
- 16.5 m (54.1 ft)
- Lanes
- 2
- Daily Traffic
- 9,400
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.