US 50 ML over OLD SH 227ML SALT CREEK

LEAVING PUEBLO · County 101, Colorado · Built 2003 · 6 Lanes · 23,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
L-18-BD
Year Built
2003
Length
94.5 m (310 ft)
Max Span
37.1 m
Width
36 m (118.1 ft)
Lanes
6
Daily Traffic
23,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.