MESA AVE over I 25 ML

IN PUEBLO · County 101, Colorado · Built 1957 · 2 Lanes · 1,933 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
L-18-AU
Year Built
1957
Length
79.4 m (260.5 ft)
Max Span
18.9 m
Width
15.9 m (52.2 ft)
Lanes
2
Daily Traffic
1,933
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$489,000
Total Project Cost
$734,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.