I 25 ML over US 50 BUS. RTE.
IN PUEBLO I25/Santa Fe · County 101, Colorado · Built 1958 · 5 Lanes · 51,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
38.256158, -104.60675
This bridge is in worse condition than 70.2% of bridges in County 101. The average bridge in Colorado is 0 years old; this one is 68 years old.
Nearby Bridges
US 50 BUS. RTE over ARKANSAS RIVER
Built 1978
I 25 ML over ARKANSAS RIVER
Built 1958
US 50 BUS EBND over ARKANSAS RIVER
Built 1924
I 25 ML over D STREET
Built 2019
ELDORADO STREET over I 25 ML
Built 1958
I 25 ML over UPRR
Built 2019
I 25 ML over SERVICE RD BNSF RR
Built 2019
I 25 ML over GRUMA DRIVE
Built 2019
Alan Hamel Ave over LAKE ELIZABETH
Built 1998
MAIN STREET over LAKE ELIZABETH
Built 1998
Bridge Details
- Structure #
- K-18-AX
- Year Built
- 1958
- Reconstructed
- 2016
- Length
- 73 m (239.5 ft)
- Max Span
- 20.1 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 5
- Daily Traffic
- 51,000
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $587,000
- Total Project Cost
- $881,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.