I 25 ML over GRUMA DRIVE
IN PUEBLO · County 101, Colorado · Built 2019 · 6 Lanes · 52,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
38.264783, -104.604581
This bridge is in worse condition than 20.8% of bridges in County 101. The average bridge in Colorado is 0 years old; this one is 7 years old.
Nearby Bridges
I 25 ML over SERVICE RD BNSF RR
Built 2019
I 25 ML over 1ST ST
Built 1959
Alan Hamel Ave over LAKE ELIZABETH
Built 1998
I 25 ML over UPRR
Built 2019
MAIN STREET over LAKE ELIZABETH
Built 1998
I 25 ML over D STREET
Built 2019
I 25 ML over SH 96 ML
Built 1959
UNION AVENUE over LAKE ELIZABETH
Built 1998
SH 96 ML over UP RR FOUNTAIN CRK
Built 1954
I 25 ML over 5TH STREET
Built 1959
Bridge Details
- Structure #
- K-18-DB
- Year Built
- 2019
- Length
- 35.1 m (115.2 ft)
- Max Span
- 34 m
- Width
- 46.7 m (153.2 ft)
- Lanes
- 6
- Daily Traffic
- 52,000
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.