I 25 ML over SH 96 ML

IN PUEBLO · County 101, Colorado · Built 1959 · 6 Lanes · 52,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
K-18-CR
Year Built
1959
Reconstructed
1990
Length
50.5 m (165.7 ft)
Max Span
14.6 m
Width
38.6 m (126.6 ft)
Lanes
6
Daily Traffic
52,000
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.