I 25 ML over 1ST ST
IN PUEBLO · County 101, Colorado · Built 1959 · 4 Lanes · 26,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
38.267942, -104.604956
This bridge is in worse condition than 36.2% of bridges in County 101. The average bridge in Colorado is 0 years old; this one is 67 years old.
Nearby Bridges
I 25 ML over SH 96 ML
Built 1959
I 25 ML over GRUMA DRIVE
Built 2019
I 25 ML over 5TH STREET
Built 1959
SH 96 ML over UP RR FOUNTAIN CRK
Built 1954
I 25 ML over SERVICE RD BNSF RR
Built 2019
Alan Hamel Ave over LAKE ELIZABETH
Built 1998
MAIN STREET over LAKE ELIZABETH
Built 1998
UNION AVENUE over LAKE ELIZABETH
Built 1998
8TH STREET over I25 DRGWRR FOUNTAIN CRK
Built 1928
I 25 ML over UPRR
Built 2019
Bridge Details
- Structure #
- K-18-CN
- Year Built
- 1959
- Reconstructed
- 2019
- Length
- 47.5 m (155.8 ft)
- Max Span
- 13.7 m
- Width
- 28.7 m (94.2 ft)
- Lanes
- 4
- Daily Traffic
- 26,000
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $191,000
- Total Project Cost
- $287,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.