SB SH 21 RAMP over NB SH 21 RAMP
SH21 AND I25 INT · County 041, Colorado · Built 2021 · 1 Lanes · 37,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
39.019953, -104.827219
This bridge is in worse condition than 41.2% of bridges in County 041. The average bridge in Colorado is 0 years old; this one is 5 years old.
Nearby Bridges
NB I25 ML over NB SH 21 RAMP
Built 2021
NB I25 ML over SB SH21 RAMP
Built 2021
SPECTRUM LOOP over VOYAGER PARKWAY | I25 RA
Built 2019
RAMP TO NORTHGATE over NB SH 21 RAMP
Built 2021
SB I25 ML over NB SH 21 RAMP
Built 2021
SB I25 ML over SB SH21 RAMP
Built 2021
I25 NB OFF RAMP over SMITH CREEK
Built 2022
I 25 ML NBND over SMITH CREEK
Built 1958
I25ML SBND RAMPS over SMITH CREEK
Built 1957
I 25 ML SBND RAMP over MONUMENT CREEK BRANCH
Built 1958
Bridge Details
- Structure #
- I-17-QJ
- Year Built
- 2021
- Length
- 59.2 m (194.2 ft)
- Max Span
- 28.8 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 1
- Daily Traffic
- 37,000
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.