SB SH 21 RAMP over NB SH 21 RAMP

SH21 AND I25 INT · County 041, Colorado · Built 2021 · 1 Lanes · 37,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
I-17-QJ
Year Built
2021
Length
59.2 m (194.2 ft)
Max Span
28.8 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
37,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.