I25ML SBND RAMPS over SMITH CREEK
5.1 MI S OF JCT SH 105 ML · County 041, Colorado · Built 1957 · 6 Lanes · 46,000 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
39.023472, -104.833536
This bridge is in worse condition than 60.7% of bridges in County 041. The average bridge in Colorado is 0 years old; this one is 69 years old.
Nearby Bridges
I 25 ML NBND over SMITH CREEK
Built 1958
I 25 ML SBND over AF ACADEMY (NORTH GATE)
Built 1958
I25 NB OFF RAMP over SMITH CREEK
Built 2022
I 25 ML NBND over AF ACADEMY (NORTH GATE)
Built 1958
SB I25 ML over SB SH21 RAMP
Built 2021
RAMP TO NORTHGATE over NB SH 21 RAMP
Built 2021
OLD SANTA FE TRAIL over NORTH GATE BLVD
Built 1957
NB I25 ML over SB SH21 RAMP
Built 2021
NB I25 ML over NB SH 21 RAMP
Built 2021
SB SH 21 RAMP over NB SH 21 RAMP
Built 2021
Bridge Details
- Structure #
- H-17-AL
- Year Built
- 1957
- Reconstructed
- 2021
- Length
- 6.4 m (21 ft)
- Max Span
- 3 m
- Width
- 118 m (387.1 ft)
- Lanes
- 6
- Daily Traffic
- 46,000
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.