NB I25 ML over NB SH 21 RAMP
SH21 AND I25 INT · County 041, Colorado · Built 2021 · 4 Lanes · 66,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
39.018886, -104.828592
This bridge is in worse condition than 41.2% of bridges in County 041. The average bridge in Colorado is 0 years old; this one is 5 years old.
Nearby Bridges
NB I25 ML over SB SH21 RAMP
Built 2021
SB SH 21 RAMP over NB SH 21 RAMP
Built 2021
SB I25 ML over NB SH 21 RAMP
Built 2021
SB I25 ML over SB SH21 RAMP
Built 2021
RAMP TO NORTHGATE over NB SH 21 RAMP
Built 2021
SPECTRUM LOOP over VOYAGER PARKWAY | I25 RA
Built 2019
I 25 ML SBND RAMP over MONUMENT CREEK BRANCH
Built 1958
I 25 ML NBND over MONUMENT CREEK BRANCH
Built 1953
I 25 ML NBND over SMITH CREEK
Built 1958
I25 NB OFF RAMP over SMITH CREEK
Built 2022
Bridge Details
- Structure #
- H-17-DI
- Year Built
- 2021
- Length
- 34.6 m (113.5 ft)
- Max Span
- 32.5 m
- Width
- 21.6 m (70.9 ft)
- Lanes
- 4
- Daily Traffic
- 66,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.