SH 83 ML over HIGHLINE CANAL
PARKER RD & MISSISSIPPI · County 031, Colorado · Built 1976 · 7 Lanes · 29,000 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
39.6966, -104.898278
This bridge is in worse condition than 55.6% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 50 years old.
Nearby Bridges
S PARKER RD | SH83 over HIGHLINE CANAL TRAIL
Built 2022
E FLORIDA AVENUE over HIGHLINE CANAL
Built 1994
S VALENTIA STREET over HIGHLINE CANAL
Built 1995
SB QUEBEC ST over CHERRY CREEK
Built 2007
NB QUEBEC ST over CHERRY CREEK
Built 1983
S CHERRY CREEK DR over GOLDSMITH GULCH
Built 1960
MONACO PKWY over CHERRY CREEK
Built 1964
S MONACO STREET PA over STORM DRAINAGE
Built 1995
E MEXICO AVENUE over GOLDSMITH GULCH
Built 1966
S DAYTON STREET over HIGHLINE CANAL
Built 1972
Bridge Details
- Structure #
- F-17-HB
- Year Built
- 1976
- Length
- 14 m (45.9 ft)
- Max Span
- 14 m
- Width
- 30 m (98.4 ft)
- Lanes
- 7
- Daily Traffic
- 29,000
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $138,000
- Total Project Cost
- $207,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.