E FLORIDA AVENUE over HIGHLINE CANAL
0.3 MI W OF PARKER ROAD · County 031, Colorado · Built 1994 · 2 Lanes · 10,425 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 6 | Satisfactory |
Location
39.689317, -104.894764
This bridge is in worse condition than 55.6% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 32 years old.
Nearby Bridges
S PARKER RD | SH83 over HIGHLINE CANAL TRAIL
Built 2022
NB QUEBEC ST over CHERRY CREEK
Built 1983
SB QUEBEC ST over CHERRY CREEK
Built 2007
SH 83 ML over HIGHLINE CANAL
Built 1976
S CHERRY CREEK DR over GOLDSMITH GULCH
Built 1960
E MEXICO AVENUE over GOLDSMITH GULCH
Built 1966
S MONACO STREET PA over STORM DRAINAGE
Built 1995
MONACO PKWY over CHERRY CREEK
Built 1964
ILIFF AVENUE over CHERRY CREEK
Built 1981
S VALENTIA STREET over HIGHLINE CANAL
Built 1995
Bridge Details
- Structure #
- D-10-HC-295
- Year Built
- 1994
- Length
- 15.2 m (49.9 ft)
- Max Span
- 8.8 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 10,425
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $279,000
- Total Project Cost
- $307,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.